| technical | 
| input_capacity * number_of_units | 
Installed capacity | 
0
 | 
0
 | 
MWe | 
| kerosene_output_conversion | 
Kerosene output efficiency | 
0.0
 | 
0.0
 | 
% | 
| full_load_hours | 
Full load hours | 
8,000
 | 
8,000
 | 
hour / year | 
| cost | 
| total_investment_over_lifetime_per(:mw_input_capacity) | 
Investment over lifetime per MW input | 
1546
 | 
1546
 | 
EUR / MW | 
| fixed_operation_and_maintenance_costs_per(:mw_input_capacity) | 
Fixed operation and maintenance costs | 
46
 | 
46
 | 
EUR / MW / year | 
| variable_operation_and_maintenance_costs_per_full_load_hour | 
Variable operation and maintenance costs | 
3627
 | 
3627
 | 
EUR / full load hour | 
| wacc | 
Weighted average cost of capital | 
7.0
 | 
7.0
 | 
% | 
| takes_part_in_ets | 
Do emissions have to be paid through the ETS? | 
false
 | 
false
 | 
boolean | 
| other | 
| technical_lifetime | 
Technical lifetime | 
15
 | 
15
 | 
years |