Present 2.41 B 2.41 B 2.41 B
Future 2.41 B 2.41 B 2.41 B
Edges 2.41 B Outputs
5.0 %
Node MJ Type
households_water_heater_resistive_electricity_aggregator 2.29 B Share
95.0 %
Inputs Edges 2.41 B
100.0 %
Type MJ Node
Share 2.41 B households_final_demand_for_hot_water_electricity
Edges 2.41 B Outputs
5.0 %
Node MJ Type
households_water_heater_resistive_electricity_aggregator 2.29 B Share
95.0 %
Inputs Edges 2.41 B
100.0 %
Type MJ Node
Share 2.41 B households_final_demand_for_hot_water_electricity

Details

Sector households
Use energetic
Fever (Heat)
group
households_hot_water
share_in_group
0.05472367874296989
technology_curve_type
default
type
producer
Node groups
  1. demand_driven
  2. heat_production
  3. etmoses
  4. merit_household_hot_water_producers
  5. application_group
  6. aggregator_producer
  7. lv_net_demand
  8. wacc_households
  9. merit_order_csv_include
  10. costs_building_and_installations_households
Used in Gqueries
  1. electricity_used_for_heating_in_households_except_heat_pumps
  2. households_water_heater_resistive_electricity_delta_in_investment_cost_table
  3. households_water_heater_resistive_electricity_future_in_investment_cost_table
  4. households_water_heater_resistive_electricity_number_of_units
  5. households_water_heater_resistive_electricity_present_in_investment_cost_table
  6. total_cost_of_households_water_heater_resistive_electricity
  7. turk_full_load_hours_of_households_water_heater_resistive_electricity
  8. turk_number_of_units_of_households_water_heater_resistive_electricity
Used in Inputs
  1. households_heater_electricity_heat_output_capacity
  2. households_heater_electricity_share
Method Label Present Future Unit
technical
heat_output_conversion Heat efficiency (LHV) 95.0 95.0 %
heat_output_capacity Heat capacity per unit 0.002 0.002 MW / unit
full_load_hours Full load hours 976.7 976.7 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 135 135 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 3 3 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.002 0.002 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 976.7 976.7 0%
households_supplied_per_unit 0 0
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 135 135 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 3 3 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 2.41 B 2.41 B 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 2.41 B 2.41 B 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.003 0.003 -4%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.297 0.245 -17%
final_demand 2.41 B 2.41 B 0%
primary_demand 4.38 B 4.27 B -2%
primary_demand_of_fossil 3.08 B 3.22 B 4%
primary_demand_of_sustainable 1.3 B 1.05 B -19%
primary_demand_of_wood_pellets 154.1 M 0 -100%
primary_demand_of_biogas 22.41 M 24.93 M 11%
primary_demand_of_electricity 593.21 M 511.09 M -13%
primary_demand_of_coal 1.1 B 910.49 M -17%
primary_demand_of_lng 27.05 M 31.77 M 17%
primary_demand_of_natural_gas 1.83 B 2.15 B 17%
primary_demand_of_biogenic_waste 143.16 M 197.38 M 37%
primary_demand_of_non_biogenic_waste 126.95 M 175.03 M 37%
primary_demand_of_uranium_oxide 294.16 M 230.74 M -21%
primary_demand_of_imported_electricity 91.94 M 29.88 M -67%
technical
input_capacity 0.002 0.002 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 0.002 0.002 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 434 K 434 K 0%
costs_per_plant
total_costs_per(:plant) 28.78 28.04 -2% euro / plant
fixed_costs_per(:plant) 13.35 13.35 0%
cost_of_capital_per(:plant) 1.35 1.35 0%
depreciation_costs_per(:plant) 9 9 0%
variable_costs_per(:plant) 15.43 14.69 -4%
fuel_costs_per(:plant) 15.43 14.69 -4%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 3 3 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 135 135 0%
costs_per_node
total_costs_per(:node) 12.5 M 12.18 M -2%
fixed_costs_per(:node) 5,798 K 5,798 K 0%
cost_of_capital_per(:node) 586 K 586 K 0%
depreciation_costs_per(:node) 3,909 K 3,909 K 0%
variable_costs_per(:node) 6,702 K 6,381 K -4%
fuel_costs_per(:node) 6,702 K 6,381 K -4%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 1,303 K 1,303 K 0%
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 58.64 M 58.64 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 19,187.4 18,694 -2%
fixed_costs_per(:mw_heat) 8,900 8,900 0%
cost_of_capital_per(:mw_heat) 900 900 0%
depreciation_costs_per(:mw_heat) 6,000 6,000 0%
variable_costs_per(:mw_heat) 10,287.4 9,794 -4%
fuel_costs_per(:mw_heat) 10,287.4 9,794 -4%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 2,000 2,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 90,000 90,000 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 19.65 19.14 -2%
fixed_costs_per(:mwh_heat) 9.11 9.11 0%
cost_of_capital_per(:mwh_heat) 0.921 0.921 0%
depreciation_costs_per(:mwh_heat) 6.14 6.14 0%
variable_costs_per(:mwh_heat) 10.53 10.03 -4%
fuel_costs_per(:mwh_heat) 10.53 10.03 -4%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 2.05 2.05 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 92.15 92.15 0%