Present 250.73 M 250.73 M 250.73 M
Future 250.73 M 250.73 M 250.73 M
Edges 250.73 M Outputs
0.0 %
Node MJ Type
households_water_heater_heatpump_ground_water_electricity_aggregator 250.73 M Share
100.0 %
Inputs Edges 250.73 M
66.67 %
Type MJ Node
Share 167.15 M environment_earth_ambient_heat
33.33 %
Type MJ Node
Share 83.58 M households_final_demand_for_hot_water_electricity
Edges 250.73 M Outputs
0.0 %
Node MJ Type
households_water_heater_heatpump_ground_water_electricity_aggregator 250.73 M Share
100.0 %
Inputs Edges 250.73 M
66.67 %
Type MJ Node
Share 167.15 M environment_earth_ambient_heat
33.33 %
Type MJ Node
Share 83.58 M households_final_demand_for_hot_water_electricity

Details

Sector households
Use energetic
Fever (Heat)
group
households_hot_water
share_in_group
0.005989853739445363
technology_curve_type
default
type
producer
Storage
cost_per_mwh
50713.75
decay
0.0
volume
0.005
Node groups
  1. demand_driven
  2. heat_production
  3. etmoses
  4. merit_household_hot_water_producers
  5. application_group
  6. aggregator_producer
  7. lv_net_demand
  8. wacc_households
  9. merit_order_csv_include
  10. costs_building_and_installations_households
Used in Gqueries
  1. biggest_water_heater_share_name
  2. biggest_water_heater_share_value
  3. households_water_heater_heatpump_ground_water_electricity_cop
  4. households_water_heater_heatpump_ground_water_electricity_input_of_electricity
  5. households_water_heater_heatpump_ground_water_electricity_number_of_units
  6. total_cost_of_households_water_heater_heatpump_ground_water_electricity
Used in Inputs
  1. households_heater_heatpump_ground_water_electricity_heat_output_capacity
  2. households_heater_heatpump_ground_water_electricity_share
  3. investment_costs_electric_heat_pumps
  4. investment_costs_households_storage_water_heating
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 3 3 COP
heat_output_capacity Heat capacity per unit 0.01 0.01 MW / unit
full_load_hours Full load hours 146.5 146.5 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 253.6 253.6 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 0 0 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.01 0.01 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 146.5 146.5 0%
households_supplied_per_unit 1 1 0%
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 0 0 euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 0 0 euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 250.73 M 250.73 M 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 250.73 M 250.73 M 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.001 0.001 -4%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.766 0.748 -2%
final_demand 83.58 M 83.58 M 0%
primary_demand 151.9 M 148 M -2%
primary_demand_of_fossil 35.58 M 37.23 M 4%
primary_demand_of_sustainable 116.32 M 110.77 M -4%
primary_demand_of_wood_pellets 5,341 K 0 -100%
primary_demand_of_biogas 777 K 864 K 11%
primary_demand_of_electricity 20.56 M 17.72 M -13%
primary_demand_of_coal 38.09 M 31.56 M -17%
primary_demand_of_lng 938 K 1,101 K 17%
primary_demand_of_natural_gas 63.45 M 74.51 M 17%
primary_demand_of_biogenic_waste 4,962 K 6,841 K 37%
primary_demand_of_non_biogenic_waste 4,400 K 6,067 K 37%
primary_demand_of_uranium_oxide 10.2 M 7,998 K -21%
primary_demand_of_imported_electricity 3,187 K 1,036 K -67%
technical
input_capacity 0.01 0.01 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 0.01 0.01 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 47,540.9 47,540.9 0%
costs_per_plant
total_costs_per(:plant) 24.33 24.09 0% euro / plant
fixed_costs_per(:plant) 19.44 19.44 0%
cost_of_capital_per(:plant) 2.54 2.54 0%
depreciation_costs_per(:plant) 16.9 16.9 0%
variable_costs_per(:plant) 4.89 4.65 -4%
fuel_costs_per(:plant) 4.89 4.65 -4%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 0 0
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 253.6 253.6 0%
costs_per_node
total_costs_per(:node) 1,157 K 1,145 K 0%
fixed_costs_per(:node) 924 K 924 K 0%
cost_of_capital_per(:node) 121 K 121 K 0%
depreciation_costs_per(:node) 804 K 804 K 0%
variable_costs_per(:node) 232 K 221 K -4%
fuel_costs_per(:node) 232 K 221 K -4%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 12.05 M 12.05 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 2,432.7 2,409.2 0%
fixed_costs_per(:mw_heat) 1,944 1,944 0%
cost_of_capital_per(:mw_heat) 253.6 253.6 0%
depreciation_costs_per(:mw_heat) 1,690.5 1,690.5 0%
variable_costs_per(:mw_heat) 488.7 465.2 -4%
fuel_costs_per(:mw_heat) 488.7 465.2 -4%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 0 0
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 25,356.9 25,356.9 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 16.61 16.45 0%
fixed_costs_per(:mwh_heat) 13.27 13.27 0%
cost_of_capital_per(:mwh_heat) 1.73 1.73 0%
depreciation_costs_per(:mwh_heat) 11.54 11.54 0%
variable_costs_per(:mwh_heat) 3.34 3.18 -4%
fuel_costs_per(:mwh_heat) 3.34 3.18 -4%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 173.1 173.1 0%