Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 0 Share
100.0 %
0.0 %
Inputs Edges 0
94.76 %
Type MJ Node
Share 0 environment_water_ambient_cold
5.24 %
Type MJ Node
Share 0 buildings_final_demand_for_cooling_electricity
Edges 0 Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 0 Share
100.0 %
0.0 %
Inputs Edges 0
94.76 %
Type MJ Node
Share 0 environment_water_ambient_cold
5.24 %
Type MJ Node
Share 0 buildings_final_demand_for_cooling_electricity

Details

Sector buildings
Use energetic
Merit Order
group
buildings_cooling
level
lv
subtype
generic
type
consumer
Node groups
  1. heat_production
  2. application_group
  3. lv_net_demand
  4. wacc_proven_tech
  5. costs_building_and_installations_buildings
Used in Gqueries
Used in Inputs
  1. buildings_cooling_heatpump_surface_water_water_ts_electricity_share
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 19.09 19.09 COP
heat_output_capacity Heat capacity per unit 2.25 2.25 MW / unit
full_load_hours Full load hours 2,190 2,190 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 954 K 954 K EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 67,530 67,530 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 30 30 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 2.25 2.25 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 2,190 2,190 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 30 30 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 954 K 954 K 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 67,530 67,530 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 0 0
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0 0 -4%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.961 0.959 0%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 2.25 2.25 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity 2.25 2.25 0% MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 121 K 121 K 0% euro / plant
fixed_costs_per(:plant) 118 K 118 K 0%
cost_of_capital_per(:plant) 19,070 19,070 0%
depreciation_costs_per(:plant) 31,783.3 31,783.3 0%
variable_costs_per(:plant) 2,709.8 2,575.5 -4%
fuel_costs_per(:plant) 2,709.8 2,575.5 -4%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 67,530 67,530 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 954 K 954 K 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 53,819.2 53,759.5 0%
fixed_costs_per(:mw_heat) 52,614.8 52,614.8 0%
cost_of_capital_per(:mw_heat) 8,475.6 8,475.6 0%
depreciation_costs_per(:mw_heat) 14,125.9 14,125.9 0%
variable_costs_per(:mw_heat) 1,204.3 1,144.7 -4%
fuel_costs_per(:mw_heat) 1,204.3 1,144.7 -4%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 30,013.3 30,013.3 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 424 K 424 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 24.57 24.55 0%
fixed_costs_per(:mwh_heat) 24.03 24.03 0%
cost_of_capital_per(:mwh_heat) 3.87 3.87 0%
depreciation_costs_per(:mwh_heat) 6.45 6.45 0%
variable_costs_per(:mwh_heat) 0.55 0.523 -4%
fuel_costs_per(:mwh_heat) 0.55 0.523 -4%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 13.7 13.7 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 193.5 193.5 0%