Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 0 Share
100.0 %
0.0 %
Inputs Edges 0
77.78 %
Type MJ Node
Share 0 environment_air_ambient_cold
22.22 %
Type MJ Node
Share 0 buildings_final_demand_for_cooling_electricity
Edges 0 Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 0 Share
100.0 %
0.0 %
Inputs Edges 0
77.78 %
Type MJ Node
Share 0 environment_air_ambient_cold
22.22 %
Type MJ Node
Share 0 buildings_final_demand_for_cooling_electricity

Details

Sector buildings
Use energetic
Merit Order
group
buildings_cooling
level
lv
subtype
generic
type
consumer
Node groups
  1. heat_production
  2. application_group
  3. wacc_proven_tech
  4. costs_building_and_installations_buildings
Used in Gqueries
  1. buildings_cooling_heatpump_air_water_electricity_cop
  2. buildings_cooling_heatpump_air_water_electricity_input_of_electricity
  3. buildings_cooling_heatpump_air_water_electricity_number_of_units
Used in Inputs
  1. buildings_cooling_heatpump_air_water_electricity_share
  2. investment_costs_electric_heat_pumps
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 4.5 4.5 COP
heat_output_capacity Heat capacity per unit 0.01 0.01 MW / unit
full_load_hours Full load hours 560 560 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 9,098 9,098 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 100 100 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.01 0.01 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 560 560 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 9,098 9,098 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 100 100 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 0 0
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.001 0.001 -4%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.836 0.824 -1%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 0.01 0.01 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity 0.01 0.01 0% MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 810.6 809.9 0% euro / plant
fixed_costs_per(:plant) 797.5 797.5 0%
cost_of_capital_per(:plant) 90.98 90.98 0%
depreciation_costs_per(:plant) 606.5 606.5 0%
variable_costs_per(:plant) 13.06 12.41 -4%
fuel_costs_per(:plant) 13.06 12.41 -4%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 100 100 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 9,098 9,098 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 81,057.5 80,992.7 0%
fixed_costs_per(:mw_heat) 79,751.3 79,751.3 0%
cost_of_capital_per(:mw_heat) 9,098 9,098 0%
depreciation_costs_per(:mw_heat) 60,653.3 60,653.3 0%
variable_costs_per(:mw_heat) 1,306.1 1,241.4 -4%
fuel_costs_per(:mw_heat) 1,306.1 1,241.4 -4%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 10,000 10,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 910 K 910 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 144.7 144.6 0%
fixed_costs_per(:mwh_heat) 142.4 142.4 0%
cost_of_capital_per(:mwh_heat) 16.25 16.25 0%
depreciation_costs_per(:mwh_heat) 108.3 108.3 0%
variable_costs_per(:mwh_heat) 2.33 2.22 -4%
fuel_costs_per(:mwh_heat) 2.33 2.22 -4%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 17.86 17.86 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 1,624.6 1,624.6 0%