Present 57.55 B 57.55 B 57.55 B
Future 57.55 B 57.55 B 57.55 B
Edges 57.55 B Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 57.55 B Flexible
100.0 %
0.0 %
Inputs Edges 57.55 B
75.0 %
Type MJ Node
Share 43.17 B environment_air_ambient_cold
25.0 %
Type MJ Node
Share 14.39 B buildings_final_demand_for_cooling_electricity
Edges 57.55 B Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 57.55 B Flexible
100.0 %
0.0 %
Inputs Edges 57.55 B
75.0 %
Type MJ Node
Share 43.17 B environment_air_ambient_cold
25.0 %
Type MJ Node
Share 14.39 B buildings_final_demand_for_cooling_electricity
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 4 4 COP
heat_output_capacity Heat capacity per unit 0.003 0.003 MW / unit
full_load_hours Full load hours 2,240 2,240 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 1,800 1,800 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 25 25 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.003 0.003 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 2,240 2,240 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 1,800 1,800 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 25 25 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 57.55 B 57.55 B 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 57.55 B 57.55 B 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.001 0.001 -4%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.816 0.802 -1%
final_demand 14.39 B 14.39 B 0%
primary_demand 26.73 B 26 B -2%
primary_demand_of_fossil 4.93 B 5.14 B 4%
primary_demand_of_sustainable 21.8 B 20.87 B -4%
primary_demand_of_wood_pellets 964.51 M 0 -100%
primary_demand_of_biogas 140.26 M 155.76 M 11%
primary_demand_of_electricity 3.01 B 2.52 B -16%
primary_demand_of_coal 6.88 B 5.69 B -17%
primary_demand_of_lng 169.3 M 198.49 M 17%
primary_demand_of_natural_gas 11.46 B 13.43 B 17%
primary_demand_of_biogenic_waste 896.05 M 1.23 B 37%
primary_demand_of_non_biogenic_waste 794.6 M 1.09 B 37%
primary_demand_of_uranium_oxide 1.84 B 1.44 B -21%
primary_demand_of_imported_electricity 575.47 M 186.72 M -67%
technical
input_capacity 0.003 0.003 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity 0.003 0.003 0% MWinput
number_of_units 2,855 K 2,855 K 0%
costs_per_plant
total_costs_per(:plant) 195.7 195 0% euro / plant
fixed_costs_per(:plant) 181 181 0%
cost_of_capital_per(:plant) 36 36 0%
depreciation_costs_per(:plant) 120 120 0%
variable_costs_per(:plant) 14.69 13.97 -4%
fuel_costs_per(:plant) 14.69 13.97 -4%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 25 25 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 1,800 1,800 0%
costs_per_node
total_costs_per(:node) 558.69 M 556.61 M 0%
fixed_costs_per(:node) 516.74 M 516.74 M 0%
cost_of_capital_per(:node) 102.78 M 102.78 M 0%
depreciation_costs_per(:node) 342.59 M 342.59 M 0%
variable_costs_per(:node) 41.95 M 39.87 M -4%
fuel_costs_per(:node) 41.95 M 39.87 M -4%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 71.37 M 71.37 M 0%
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 5.14 B 5.14 B 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 78,277.6 77,986.3 0%
fixed_costs_per(:mw_heat) 72,400 72,400 0%
cost_of_capital_per(:mw_heat) 14,400 14,400 0%
depreciation_costs_per(:mw_heat) 48,000 48,000 0%
variable_costs_per(:mw_heat) 5,877.6 5,586.3 -4%
fuel_costs_per(:mw_heat) 5,877.6 5,586.3 -4%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 10,000 10,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 720 K 720 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 34.95 34.82 0%
fixed_costs_per(:mwh_heat) 32.32 32.32 0%
cost_of_capital_per(:mwh_heat) 6.43 6.43 0%
depreciation_costs_per(:mwh_heat) 21.43 21.43 0%
variable_costs_per(:mwh_heat) 2.62 2.49 -4%
fuel_costs_per(:mwh_heat) 2.62 2.49 -4%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 4.46 4.46 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 321.4 321.4 0%