interconnection_net_costs_delta_present_future_wacc debug
GQL Statement
V(energy_power_hv_network_electricity,wacc)
Result
2019 0.09 ms |
0.03
|
euro |
2050 0.02 ms |
0.03
|
euro |
Description
This query retrieves the WACC used in calculating the capital costs. The query is used in the ETM costs export.
Characteristics
Groups | |
Unit | euro |
File path |
/app/tmp/etsource/gqueries/modules/network_calculation/interconnection_net/costs/interconnection_net_costs_delta_present_future_wacc.gql
|
References
Gquery | interconnection_net_costs_delta_present_future_capital_costs |